原材料規(guī)定
Raw material regulations
依據(jù)設計方案規(guī)定農(nóng)村基層狀況工程施工自然環(huán)境和時節(jié),挑選選購工業(yè)涂料以及他配套原材料。
Select and purchase industrial coatings and other supporting raw materials according to the rural grass-roots conditions, natural environment and season of project construction specified in the design scheme.
關鍵機器:
Key machines:
①涂漆專用工具:排筆棕刷料桶等;
① Special tools for painting: brush barrel, etc;
②隆源噴涂機具:空壓機(大標準氣壓10Mpa,排氣管室0.6m3)
② Longyuan spraying equipment: air compressor (maximum standard air pressure 10MPa, exhaust pipe chamber 0.6m3)
髙壓無氣噴涂機(含配套設施機器設備);
High pressure airless spraying machine (including supporting facilities and equipment);
③噴斗噴漆槍液壓膠管等;
③ Spray bucket, spray gun, hydraulic hose, etc;
④滾漆專用工具:長毛絨輥壓花輥服裝印花輥硬質(zhì)的塑膠或橡膠輥;
④ Special tools for paint rolling: Plush roller, embossing roller, garment printing roller, hard plastic or rubber roller;
⑤彈涂專用工具:手動式或電動式彈涂器及配套設施機器設備;
⑤ Special tools for elastic coating: manual or electric elastic coating device and supporting facilities, machinery and equipment;
⑥抹涂專用工具:不銹鋼板刮尺塑膠刮尺托灰板等;
⑥ Special tools for plastering: stainless steel plate scraper ruler, plastic scraper ruler, ash support plate, etc;
⑦便攜式電動攪拌機等。
⑦ Portable electric mixer, etc.
作業(yè)環(huán)境:
Working environment:
①混泥土和墻壁抹抹灰砂漿之上的灰完成,且歷經(jīng)干躁,GRC預制構件含水量應合乎以下規(guī)定:
① The water content of GRC prefabricated components shall meet the following requirements after the concrete and wall plastering mortar are completed and dry:
表層施涂溶劑型涂料時,含水量不可超過8%;
When applying solvent based coating on the surface, the water content shall not exceed 8%;
表層施涂水溶性和浮液建筑涂料時,含水量不可超過10%。
When applying water-soluble and floating architectural coatings on the surface, the water content shall not exceed 10%.
②水電工程及機器設備頂墻壁預埋埋件完成。
② Completion of embedded parts on the top wall of hydropower projects and machinery and equipment.
③門窗制作完成并已施涂一遍功底油(油酯耐磨涂料),如選用機械設備噴漆建筑涂料時,應將不噴漆的位置遮住,防止環(huán)境污染。
③ Doors and windows have been fabricated and applied with one coat of power base oil (oil ester wear-resistant coating). If mechanical equipment is selected to spray architectural coating, the position that is not sprayed shall be covered to prevent environmental pollution.
④水溶性和保濕乳液建筑涂料施涂時的工作溫度,隆源GRC預制構件應按產(chǎn)品手冊的溫控。冬季房間內(nèi)施涂建筑涂料時,應在集中供暖標準下開展,室內(nèi)溫度應維持平衡,不可忽然轉(zhuǎn)變。
(4) the working temperature of water soluble and moisturizing emulsion building coating is controlled by the temperature control of Longyuan GRC prefabricated component according to the product manual. When applying architectural coatings in the room in winter, it shall be carried out under the central heating standard, and the indoor temperature shall be maintained in balance without sudden change.
標準是先弄之后先頂篷后墻壁。農(nóng)村基層→分分格縫→施涂機建筑涂料→噴滾彈主鍍層→噴滾彈整體面層建筑涂料→建筑涂料整修
The standard is to make it first, then the roof and then the wall. Rural base course solution → dividing and dividing joints → applicator architectural coating → main coating of roll coating → overall surface architectural coating of roll coating → architectural coating renovation
分格縫:先依據(jù)設計方案規(guī)定開展吊豎直套方找老規(guī)矩彈分格縫。各項任務務必嚴苛按設計標高操縱好,務必確保房屋建筑四周要交圈,也要考慮到隆源GRC內(nèi)墻涂料工程項目分段進行時,應以分格縫墻的陰角線處或水落管等為交界線和沉降縫,豎直分格縫則務必開展吊直,干萬不能用尺量,不然差2mm亦會很顯著,縫格務必是豎直光潔大小一致等
Dividing joint: firstly, according to the provisions of the design scheme, hang the vertical sleeve, find the old rules and snap the dividing joint. All tasks must be strictly controlled according to the design elevation, and it must be ensured that the surrounding of the house building should be crossed. It should also be considered that when the Longyuan GRC interior wall coating project is carried out in sections, the internal corner line of the dividing joint wall or the downpipe should be taken as the boundary and settlement joint, and the vertical dividing joint must be lifted straight. It can not be measured with a ruler, otherwise the difference of 2mm will be significant, The seam grid must be vertical, smooth, uniform in size, etc