GRC構(gòu)件線條就是指一種以耐堿玻璃纖維為提高材料。GRC裝飾線條屬于GRC建筑細(xì)部裝飾構(gòu)件中的一個(gè)常見構(gòu)件類別。將工程建筑分開或在頂部做弧線,使外觀更大氣、豪華、美觀。但是,GRC線和其他功能性建筑材料裝飾對(duì)施工環(huán)境有一定的標(biāo)準(zhǔn)。下面,小編帶你一起了解一下,希望能幫助到你!
GRC component line refers to a kind of alkali resistant glass fiber for improving material. GRC decorative line belongs to a common component category of GRC architectural detail decorative components. Separate the engineering buildings or make arc on the top to make the appearance more grand, luxurious and beautiful. However, GRC line and other functional building materials decoration have certain standards for the construction environment. Now, Xiaobian will take you to know about it, hoping to help you!
GRC裝飾線施工標(biāo)準(zhǔn):
GRC decoration line construction standard:
1.雨天不能施工。
1. Construction cannot be carried out in rainy days.
2、施工時(shí)要保持墻面基本干燥躁凈。
2. Keep the wall dry and clean during construction.
3.在施工環(huán)境中風(fēng)速較大的情況下
3. Under the condition of high wind speed in the construction environment
4.在強(qiáng)風(fēng)和高溫條件下,應(yīng)在陽光直射的墻面上進(jìn)行施工,以避免GRC施工中因缺水過快而出現(xiàn)發(fā)毛現(xiàn)象。
4. Under strong wind and high temperature conditions, the construction should be carried out on the wall in direct sunlight to avoid hairiness due to water shortage during GRC construction.
5、施工墻面用2米水平尺檢查,誤差應(yīng)小于4毫米;多余的零件應(yīng)該修理
5. The construction wall should be checked with a 2m level, and the error should be less than 4mm; The spare parts should be repaired
6.施工現(xiàn)場(chǎng)環(huán)境溫度和基墻表面溫度在施工后24小時(shí)內(nèi)不得低于5,一般在5-35進(jìn)行施工。
6. The ambient temperature of the construction site and the surface temperature of the foundation wall shall not be lower than 5 within 24 hours after the construction, and the construction is generally carried out in 5-35 hours.
7、施工后為防止雨水侵蝕,應(yīng)進(jìn)行養(yǎng)護(hù)。
7. In order to prevent rain erosion after construction, maintenance should be carried out.
8.施工過程中,隨時(shí)隨地掌握天氣變化,進(jìn)行施工調(diào)整。惡劣天氣禁止施工。
8. In the process of construction, the weather changes should be grasped anytime and anywhere, and the construction adjustment should be carried out. Construction is prohibited in bad weather.
9.在建GRC構(gòu)件不允許進(jìn)行其他施工。
9. No other construction is allowed for GRC members under construction.
10、應(yīng)隨時(shí)隨地掌握未來三天的天氣情況,以防雨天禁止施工。
10. The weather conditions of the next three days should be known at any time to prevent construction in rainy days.
Thank you for reading, hope the above content is helpful to you, if you want to know more wonderful content, please click our official website: Jinan GRC component http://1111tk.cn .