1、把兩半柱礎(chǔ)扣在柱子底部,把接縫處焊點焊牢,使之成為一個整體;
1. First, buckle the two half column bases at the bottom of the column, weld the joints firmly, and make them a whole;
2、校正位置使柱子在中心;
2. Correct the position so that the column is in the center;
3、用水泥砂漿把柱礎(chǔ)和內(nèi)柱之間的空隙灌滿;
3. Fill the gap between the column base and the inner column with cement mortar;
4、同樣的方法依次向上安柱身,一節(jié)一澆灌,直到柱頭為止。羅馬柱安裝節(jié)點圓桶羅馬柱安裝有兩種:一種是非承重型空體羅馬柱安裝,另一種是承重型羅馬柱安裝。
4. In the same way, the column body is installed upward in turn, and the water is poured one by one until the column head. There are two kinds of Roman column installation nodes: one is the non load bearing empty Roman column installation, the other is the load-bearing Roman column installation.
、非承重型空體GRC羅馬柱安裝節(jié)點
First, non load bearing empty GRC Roman column installation node
1、要在柱子安裝位置,磚徹體或混凝土中上下預(yù)埋焊點。
1. First of all, the welding points shall be embedded up and down in the column installation position, brick body or concrete.
2、按GRC構(gòu)件羅馬柱的內(nèi)徑用角鋼焊成三角架做內(nèi)龍骨,下面先與地下埋件焊接牢固,上面先留有余地,三角架可隨安裝隨往上接。
2. According to the inner diameter of the GRC component Roman column, angle steel is welded into a tripod to make the inner keel. The lower part is welded firmly with the underground embedded parts first, and there is room on the upper part. The tripod can be connected up with the installation.
3、把柱礎(chǔ)、柱身套在龍骨上,校正好凹槽位置,然后把柱礎(chǔ)柱身上面埋有的焊點用鋼筋連結(jié)在龍骨上,依次一節(jié)一節(jié)的對槽垂直安裝,直到后一節(jié)柱身為止。
3. Put the column base and the column body on the keel, correct the groove position, and then connect the welding points embedded on the column body with steel bars on the keel, and install them vertically one by one until the last column body.
4、柱頭是由兩半構(gòu)成,把三角龍骨一直接到上面埋件焊死,然后先把頭和半柱頭組合好,把接縫處的所有焊點焊死。
4. The column head is composed of two parts. Weld the embedded parts directly to the top of the triangular keel, and then assemble the head and the first half of the column head to weld all the welding joints at the joint.
5、后用水泥把所有接縫處理平整,圓滑即可。
5. Finally, use cement to smooth all joints.
第二、承重型GRC羅馬柱安裝方法
Second, installation method of load-bearing GRC Roman column
同于非承重型GRC構(gòu)件羅馬柱安裝方法,只是在安裝完畢后,從上口灌入混凝土即可,不同的是承重型GRC羅馬柱要先安柱而后蓋頂,否則混凝土則無法灌入而非承重型GRC羅馬柱則可先有建筑物而后安GRC羅馬柱裝飾。
As for the installation method of non load bearing GRC component Roman column, only after the installation is completed, the concrete can be poured from the upper opening. The difference is that the load-bearing GRC Roman column should be installed first and then covered, otherwise the concrete can not be poured into the non load-bearing GRC Roman column, and then the building can be installed first and then the GRC Roman column decoration.
The above is the whole content of the production and installation of GRC component Roman column. Jinan GRC component is dedicated. If you have other questions, please consult Jinan GRC component website http://1111tk.cn !